Biosolids Management

Dredging & Dewatering

Flexible Fluid Transport Solutions

Industrial Effluents Treatment

Lead Free Solutions

PFAS Removal Solutions

Water Main Renewal

Construction & Demolition Fines Recycling

Environmental Site Remediation

Industrial Degraded Sites Management

Regulated Materials Management

Risk Assessment

Soil and Material Management

LEAD FREE SOLUTIONS

ALTRA creates a lead-free proof barrier inside existing pipes at a fraction of the cost, time and disturbance of traditional replacement.

OUR SOLUTION HAS HANDLED EXTREME TESTING

Lead in drinking water is one of the biggest environmental health threats facing people throughout North America. We have designed the perfect water technology just for these types of challenges. ALTRA Proven Lead Solution is a trenchless, non-invasive, semi-structural pipe lining system for existing water services lines. It creates a lead-proof safe barrier inside existing pipes at a fraction of the cost, time, and disturbance of traditional replacement. It’s a surgical installation that requires only a single, tiny hole outside each home.

OUR SOLUTION HAS HANDLED EXTREME TESTING

As there is no major excavation, roads remain navigable and access to homes and businesses remains intact. Private properties stay also undamaged. We have developed a bullet-proof process allowing for a rapid installation within 2.5 hours. The speedy process allows for many installations a day and immediate return to service. The smooth bore and thin-wall pipe provide the same or increased flow capacity. ALTRA Proven Lead Solution has been extensively tested – burst tests, leak tests, tensile tests and freeze tests – and pushed it to its limits.

Contact Marc-Alexandre Gendron
Operations Director

OUR SOLUTION HAS HANDLED EXTREME TESTING

Lead in drinking water is one of the biggest environmental health threats facing people throughout North America. We have designed the perfect water technology just for these types of challenges. ALTRA Proven Lead Solution is a trenchless, non-invasive, semi-structural pipe lining system for existing water services lines. It creates a lead-proof safe barrier inside existing pipes at a fraction of the cost, time, and disturbance of traditional replacement. It’s a surgical installation that requires only a single, tiny hole outside each home.
As there is no major excavation, roads remain navigable and access to homes and businesses remains intact. Private properties stay also undamaged. We have developed a bullet-proof process allowing for a rapid installation within 2.5 hours. The speedy process allows for many installations a day and immediate return to service. The smooth bore and thin-wall pipe provide the same or increased flow capacity. ALTRA Proven Lead Solution has been extensively tested – burst tests, leak tests, tensile tests and freeze tests – and pushed it to its limits.
Contact Marc-Alexandre Gendron
Operations Director

TOP 10 BENEFITS

01

Most resilient solution: Proven technology with over 1/2 million installations around the world

06

Proven resiliency: 25 year life warranty – demonstrated with extreme testing

02

45% more cost effective

07

No chemical concerns

03

No excavation involved: requires only a single, tiny hole outside each home

08

Resistant to freezing temperatures

04

Only 2.5 hours to install

09

No risk of contamination

05

Environmentally friendly

10

Resiliency demonstrated with extreme testing

TOP 10 BENEFITS

01

Most resilient solution: Proven technology with over 1/2 million installations around the world

02

45% more cost effective

03

No excavation involved: requires only a single, tiny hole outside each home

04

Only 2.5 hours to install

05

Environmentally friendly

06

Proven resiliency: 25 year life warranty – demonstrated with extreme testing

07

No chemical concerns

08

Resistant to freezing temperatures

09

No risk of contamination

10

Resiliency demonstrated with extreme testing

How do you implement the Next-Generation of Lead-Free Solution?​

The Next-Generation of Lead-Free Solution is particularly suitable where alternative solutions prove to be disruptive, such as alongside other infrastructure, under road crossings, in congested ground with other utilities, and in customer properties under drives and gardens. It is also especially beneficial for lining old deteriorating pipes and lines with leaching contaminants, such as lead & copper pipe, as it acts as a barrier.​

Installation Timeline:

OUR APPROACH

ALTRA Proven Lead Solution only requires a single small access pit, saving yards, sidewalks, floors, and more, from demolition. It is particularly suitable where alternative solutions prove to be disruptive, such as alongside other infrastructure, under road crossings, in congested ground with other utilities, and in customer properties under drives and gardens.

 

It is also especially beneficial for lining old deteriorating pipes and lines with leaching contaminants, such as lead & copper pipe, as it acts as a barrier. The installation takes only two hours: set-up, cleaning, lining, reconnecting and site clean-up.

OUR APPROACH

ALTRA Proven Lead Solution only requires a single small access pit, saving yards, sidewalks, floors, and more, from demolition. It is particularly suitable where alternative solutions prove to be disruptive, such as alongside other infrastructure, under road crossings, in congested ground with other utilities, and in customer properties under drives and gardens.

It is also especially beneficial for lining old deteriorating pipes and lines with leaching contaminants, such as lead & copper pipe, as it acts as a barrier. The installation takes only two hours: set-up, cleaning, lining, reconnecting and site clean-up.

Our latest lead-free solution projects

Lead-Free Pilot Project in Montréal-Est

OUR LATEST LEAD-FREE SOLUTION WEBINARS

Marc-Alexandre Gendron
Operations Director

OUR
EXPERTS

Mike Davison
Senior Director, Engineering

Lou Magurno
President, Water Infrastructure Solutions

Gilles Gagnon
Research and Development Expert

Samuel Trudeau
Project Manager

READ THE LATEST NEWS